How can complex infrastructures be easily coordinated and implemented? We plan and implement using the BIM method and the associated technologies according to the SIA phases (Schweizerischer Ingenieur- und Architektenverein). At the same time, you benefit from our know-how and experience from our own assets from a power grid that is more than 2’000 km long, starting with the planning through to operation and maintenance.
We plan network infrastructure holistically, digitally and paperlessly:
Our projects with BIM increase the quality of the end product through better communication and efficiency in planning through a central and digital approval process. BIM reduces execution times and their costs and facilitates the exchange of information in later project phases.
Together with our partners, we accompany the execution of projects. BIM is at the centre of all project information, from tendering to construction coordination across all subsections on the construction site:
On the construction site (BIM-to-field), e.g. collisions, dimensions for positioning components or drillings can be determined easily and quickly from the model. If necessary, changes can be made quickly and easily for clean documentation.
After construction, BIM models are converted into a digital twin for further and broad use in operations:
With the Digital Twin module of the Insights Platform, operations and maintenance as well as project and asset management have easy visual and time-saving access to all relevant data.